How to Prepare a Fastener RFQ
A request for quote should define the part, the quantities and the quality requirements so every supplier prices the same thing.
RFQ contents
| Section | Include |
|---|---|
| Part | Drawing or full callout, revision |
| Quantity | Annual usage, release quantities, schedule |
| Quality | Certs, sampling, PPAP/FAI if required |
| Packaging | Box quantities, labels, bar codes |
| Logistics | Delivery points, Incoterms, lead time |
| Commercial | Price breaks, validity, payment terms |
Governing standards: Procurement practice. Editions shown are the latest confirmed as of September 2026. The drawing and the governing standard always take precedence over this sheet.
These tables carry the same figures as the printed sheet below.
The printed sheet

See an error on this sheet?
Tell us what is wrong.
Text version of this sheet
How to prepare a fastener RFQ
What it is
AT A GLANCE
A request for quote should define the part, the quantities and the quality requirements so every
supplier prices the same thing.
RFQ
A complete RFQ gets comparable quotes
RFQ contents
Section
Include
Part
Drawing or full callout, revision
Quantity
Annual usage, release quantities, schedule
Quality
Certs, sampling, PPAP/FAI if required
Packaging
Box quantities, labels, bar codes
Logistics
Delivery points, Incoterms, lead time
Commercial
Price breaks, validity, payment terms
Governing standards: Procurement practice. Editions shown are the latest confirmed as of September 2026. The drawing and the governing standard always take precedence over
this sheet.
torquing any fastener. Verify the current governing standard, project documents, OEM requirements, size, thread, coating and lot certification. To the fullest extent permitted by law, The Fastener App disclaims liability
arising from reliance on this reference.